PAGE 3
Bldg.
# 2
Interior
of Bldg. #2
Signs
on wall to designate "areas" where boats were stored
A
card file was kept which indicated, as an example.."15' Fury, area
16-B"
Another Bldg #2 interior shot.
I was told that the boat hulls were molded/glued
in Bldg. #1, brought to Bldg. #2 for the addition of decks/seats/transoms and
were varnished/painted there then brought back to Bldg. #1 for installation of
fittings and upholstery. They were shipped from Bldg. #1 (since Mr. McAlister's
brother in law worked there, he seemed to know a lot about what went on)